Because of high sharp peak , vibration stress is big , and the maximum stress achieves 550mpa 由于油缸沖擊載荷有比較大的峰值,泵車動(dòng)應(yīng)力比較大,最大值達(dá)到550mpa 。
The result indicates that the maximum stress on the runner is mainly in proportion to the turbine output 結(jié)果表明在大部分工況下該轉(zhuǎn)輪葉片最大靜應(yīng)力基本上與水輪機(jī)功率成線性關(guān)系。
The maximum stress was on the apices and the stress on the cervical part was lower 種植體應(yīng)力主要為均勻分布的壓應(yīng)力,最大應(yīng)力位于種植體根尖部,頸部應(yīng)力相對較小,未見明顯彎曲應(yīng)力。
The mechanical simulation compared the stress distribution in copper lines and pore , with the result that the maximum stress locates in the corner 在力學(xué)模擬過程中,計(jì)算了銅互連線和通孔的熱應(yīng)力的分布。
The results are that the maximum displacement and maximum stress occurs at initial time and the maximum stress is less than permissible stress 結(jié)果表明,結(jié)構(gòu)最大應(yīng)力和最大位移均發(fā)生在初始時(shí)刻,最大應(yīng)力小于許用應(yīng)力。
By analyzing the optimal diffluent ratio and solder angle of the dies , the maximum stress in the body of improved dies is de - creased effectively 對模具的分流比和焊合角進(jìn)行優(yōu)化并再次模擬,發(fā)現(xiàn)分流模的最大應(yīng)力大大降低。
The stress of horizontal working states is bigger than others , and the maximum stress attaches to 540 mpa . only considering static strength , the bump auto satisfies command 水平工況應(yīng)力較大,最大應(yīng)力為540mpa ,單從靜強(qiáng)度方面考慮,該泵車滿足強(qiáng)度要求。
Using the library functions of msc . patran language the stresses of structural elements is picked up , and the maximum stress of the elements controlled by the same design variable is found 利用msc . patran的庫函數(shù),提取結(jié)構(gòu)單元的節(jié)點(diǎn)應(yīng)力,通過循環(huán)找到構(gòu)件的最大應(yīng)力。
2 the maximum stress and the maximum stress location and the distribution of the stress are attained through the static analysis of building up finite element module 2 、對建立的有限元模型進(jìn)行靜強(qiáng)度分析,得到各個(gè)工況該泵車的最大靜應(yīng)力值和最大靜應(yīng)力位置及各構(gòu)件的靜應(yīng)力分布。